Course curriculum

    1. Course 1 Introduction

      FREE PREVIEW
    2. C1 - Video 1 - Intro

      FREE PREVIEW
    3. Course 1 Video 2 ZDHC Guidelines

    4. C1 - Video 3 Water Quality Parameters Intro

    5. Course 1 V4 pH

    6. C1 - Quiz about pH

    7. C1 - Video 5 - Temperature

    8. C1 - Video 6 - Dissolved oxygen

    9. C1 - Video 7 - BOD and COD

    10. C1 - Video 8 - Nitrogen

    11. C1 - Video 9 - Total suspended solids (TSS)

    12. C1 - Video 10 - Color

    13. C1 - Video 11 - Conclusion

    14. C1 - Final quiz!

    1. Course 2 Introduction

    2. C2 - Video 1 - Textile wastewater: volumes and contaminants

    3. C2 - Quiz 1

    4. C2 - Video 2 - Pollutants and impact on water quality parameters

    5. C2 - Quiz 2

    6. C2 - Video 3 - High variability of textile wastewater characteristics

    7. C2 - Quiz 3

    8. C2 - Video 4 - Wastewater Charachterstics for Other Industries

    9. C2 - Quiz 4

    10. C2 - Video 5 - How to reduce Wastewater Pollution

    11. Factsheet - Caustic Soda recovery to reduce pollution of the wastewater

    12. C2 - Video 6 - Conclusion

    13. Factsheet - Water saving good practices to reduce the volume of wastewater generated

    14. C2 - Final quiz

    1. C3 - Video 1 - ETP definition

    2. C3 - Video 2 - ETP Design Criteria

    3. C3 - Video 3 - ETP treatment levels and mechanisms

    4. C3 - Quiz treatment mechanisms

    5. C3 - Video 4 - Preliminary treatment

    6. C3 - Case study: screening system observed during an ETP visit (not effective)

    7. C3 - Case study: equalization tank observed during an ETP visit

    8. C3 - Quiz preliminary treatment

    9. C3 - Video 5 - Primary treatment

    10. C3 - Video 6 - Secondary treatment (biological)

    11. C3 - Case study: aeration tank observed during an ETP visit (foam accumulation)

    12. C3 - Case study: secondary clarifier observed during an ETP visit

    13. C3 - Video 7 - MBBR Technology

    14. C3 - Video 8 - SBR Technology

    15. C3 - Video 9 - Other Technologies

    16. C3 - Quiz type of process

    17. C3 - Quiz biological treatment

    18. C3 - Quiz sludge

    19. C3 - Video 10 - Tertiary & Advance Treatments

    20. C3 - Video 11 - Conclusion

    21. C3 - Final quiz

    22. C3 - Case study: sludge drying bed observed during an ETP visit

    1. C4 - Video 1 - Why is it necessary to assess the ETP's

    1. C5 - Video 1 - Introduction & identification of wastewater sources

    2. Case study - wastewater drainage system

    3. C5 - Video 2 - No direct discharge into the environment or sewage lines

    4. C5 - Video 3 - Water flow meters at ETP inlet and outlet points

    5. C5 - Case study: water meter at ETP outlet point not properly installed

    6. C5 - Video 4 - Preliminary Effluent treatment

    7. C5 - Video 5 - Assessment of primary treatment

    8. C5 - Video 6 - Assessment of secondary treatment

    9. C5 - Quiz 1

    10. C5 - Video 7 - Final effluent discharge point

    11. C5 - Case study: water sample collected at the ETP outlet point

    12. C5 - Quiz 2

    13. C5 - Video 8 - Assessment of sludge management on-site

    14. Factsheet - How to control the sludge management onsite and offsite

    15. Factsheet - Sludge disposal options

    16. C5 - Video 9 - ETP laboratory & water testing

    17. C5 - Quiz 3

    18. C5- Video 10 - ETP emergency preparedness

    19. C5 - Video 11 - Assessment of ETP chemical management

    20. C5 - Video 12 - ETP common observations and mitigation plan

    21. C5 - Final quiz

    22. Case study - water level in the tanks

About this course

  • €200,00
  • 107 lessons
  • 3.5 hours of video content